Crusher Parts
Home Crusher Parts

Undergound Aftermarket Parts Arrival time Update 202509 for EPIROC

Undergound Aftermarket Parts Arrival time Update 202509 for EPIROC

 

✅ Find the Code below to get a quote

Affordable Aftermarket Parts.

✅ Get a Quick Quote 

✅ Today!

 Local after-sales team

  • Item No :

    FG110535
  • Order(MOQ) :

    1
  • Product Origin :

    China
  • Lead Time :

    25
  • Weight :

    3000kg
  • Product Details

Underground Aftermarket Parts Stock Update 202509 for EPIROC

202509

 

GET A QUOTE !

 

Product Name Code Quantity Arrival time Remark
Hydraulic cylinder of apron 54418991 2 2-4 Weeks China
Cardan shaft crosspiece 2657227787 4 2-4 Weeks Original
Hydraulic cylinder of chain wrench 2657039638 4 2-4 Weeks China
Corrugation 2657076507 4 2-4 Weeks OEM
Muffler corrugation (outlet corner) 3222336523 4 2-4 Weeks OEM
Pulse sensor B301 3176000288 4 2-4 Weeks OEM
Oscillation valve 3222312389 4 2-4 Weeks OEM
Valve min. Pressure 1604672401 3 2-4 Weeks Original
Emergency stop sensor (feeder) 3222325454 3 2-4 Weeks OEM
Exhaust valve 1626215380 2 2-4 Weeks Original
Air valve 1089045107 4 2-4 Weeks Original
Muffler damper 3222330885 4 2-4 Weeks China
Cone pin assembly 3222305657 1 2-4 Weeks Original
Pneumatic lubrication pump 3222335874 1 2-4 Weeks Original
Feed cable 2657506446 4 2-4 Weeks OEM
Feed cable 57506446 4 2-4 Weeks OEM
Valve stroke/drilling 57325623 2 2-4 Weeks Original
Air conditioner belt 2657324097 7 2-4 Weeks Original
Apron 2657572687 4 2-4 Weeks Original
Apron 2657589277 4 2-4 Weeks Original
Apron 2657591497 4 2-4 Weeks Original
Rotator repair kit 2658540258 3 2-4 Weeks Original
Receiver drain valve 3222320113 1 2-4 Weeks Original
Valve block assembly g/m supply 3222321634 1 2-4 Weeks Original
Expansion sleeve 3222315328 14 2-4 Weeks Original
Logic valve block 3222320957 1 2-4 Weeks Original
Adapter for suction hose 3222310919 3 2-4 Weeks Original
Rotator assembly 4350276303 1 2-4 Weeks Original
Control valve hydraulic motor p/p 57167298 4 2-4 Weeks OEM
Repair kit of pressure cylinder 2657512311 4 2-4 Weeks China
Repair kit of mast lifting cylinder 2657249450 4 2-4 Weeks China
Impeller dust collector 2657073389 2 2-4 Weeks OEM
End shaft seal 2652154515 2 2-4 Weeks OEM
Hydraulic cylinder of fork wrench 2658389933 4 More than 4 Weeks Original
Repair kit of apron lifting cylinder 2654454087 2 More than 4 Weeks Original
Heater fan 3222325849 4 1 Week China
Soldier valve 1604620500 4 1 Week China
Sliding plate 3128307488 216 1 Week China
Alternator belt 3222335911 6 1 Week China
Relay 3222347519 4 1 Week OEM
Relay K200 3176001519 11 1 Week OEM
Carousel gate hydraulic cylinder repair kit 3222340286 2 1 Week China
Sensor 3222148800 12 1 Week OEM
Receiver sensor B456 9106219201 2 1 Week China
Upper hydraulic cylinder bushing 3222318603 3 1 Week China
207-1549 Starter 207-1549 2 2 Weeks CAT
Diaphragm 1604707600 8 2 Weeks China
Sliding tire 3222326589 22 2 Weeks China
Sliding profile 3222343058 11 2 Weeks China
Sliding profile 3222343061 11 2 Weeks China
Dust cover 3222322075 5 2 Weeks China
R/C Rotator 2000 hp 4350276052 2 2 Weeks China
Pressure regulator air 1604707982 4 2 Weeks China
Dust suppression cap guides 3128306163 16 2 Weeks China
Dust suppression cap guides 3128306164 16 2 Weeks China
Seal kit 3222290041 1 2 Weeks China
Pneumatic hammer lubrication pump 3222338539 1 2 Weeks China
r/k Rotator 1000 hp 4350276051 1 2 Weeks China
Pin 3222310225 1 2 Weeks China
The gear failed 2657159113 2 2 Weeks China
Intermediate shaft 2657191017 2 2 Weeks China
The spacer is missing 2657159121 2 2 Weeks China
The puck missed 2657191033 2 2 Weeks China
Pin 2658366210 6 2 Weeks China
A Sliding plate 2657386427 8 2 Weeks China
A Sliding block pin 2650338987 4 2 Weeks China
Pressure cable pulley 2652228848 4 2 Weeks China
Fixed block pin 2652227337 4 2 Weeks China
A Guide block 2652147543 4 2 Weeks China
Lift chain 57501116 4 2 Weeks China
Chain sprocket 57407173 8 2 Weeks China
Rotator feed pulley 52228848 4 2 Weeks China
Pin 52227337 8 2 Weeks China
Pin 50339001 8 2 Weeks China
Sliding plate 2657386427 24 2 Weeks China
Sliding plate of carriage 2652147543 28 2 Weeks China
Alternator belt 6N-7135 7 2 Weeks China
Apron 2657591505 4 2 Weeks China
Apron 2657572711 4 2 Weeks China
Triplex pump seal 2657799660 1 2 Weeks China
R/C floating adapter 4350276053 5 2 Weeks China
Windshield wiper 3222986201 6 2 Weeks China
Bearing 3222323245 2 2 Weeks China
Sprocket double 3222338956 2 2 Weeks China
Hose drum sprocket axle 3222338958 2 2 Weeks China
Bearing 3222339584 4 2 Weeks China
A ​​RUSBURSERVIS chain guard 3222339615 2 2 Weeks China
Work table cylinder repair kit 3222340199 8 2 Weeks China
Feeder chain guide 3222340277 2 2 Weeks China
Feeder chain guide 3222340374 2 2 Weeks Original
Sprocket 3222342457 2 2 Weeks China
Contactor K11 3176000272 4 2 Weeks OEM
Chain tensioner nut 266211800 16 2 Weeks China
Coupling connecting 3216635501 2 2 Weeks China
RHS gripper cylinder 3222333512 2 2 Weeks China
Rest cylinder 3222333519 4 2 Weeks China
Corrugation 3222319459 5 2 Weeks OEM
Corrugation 3222319460 5 2 Weeks OEM
Assembly disassembly plate 3222328551 16 2 Weeks China
Rest cam 3222330090 16 2 Weeks China
Valve repair kit 2911016300 8 2 Weeks China
Universal rod disassembly die 3222311362 16 2 Weeks China
Diaphragm 3222314110 16 2 Weeks China
Manipulator die 3222319533 16 2 Weeks China
Intake pipe 3222323094 3 2 Weeks China
Connection 3222323251 3 2 Weeks China
Compressor dryer element 3222336731 3 2 Weeks China
Compressor thermostat 1619756000 2 2 Weeks China
Inlet valve seal 1626237100 2 2 Weeks Original
Runner 3128306181 16 2 Weeks China
Floating adapter 4350266221 1 2 Weeks China
Cable KS3 3222323588 3 2 Weeks China
Cable KS5 3222323590 3 2 Weeks China
Cable KS8 3222323635 3 2 Weeks China
Cable KS9 3222323636 3 2 Weeks China
Hydraulic cylinder disassembly table 3222321529 4 2 Weeks China
Bushing 500450024 12 2 Weeks China
Bearing 500450033 6 2 Weeks China
Carousel axis bushing 500450065 3 2 Weeks China
Boom base bushing 500450088 3 2 Weeks China
Bearing 500450094 3 2 Weeks China
Bushing 500450106 3 2 Weeks China
Bearing hydraulic cylinder 501000010 6 2 Weeks China
Bearing of the axis of the rotation mechanism of the grippers 504020037 3 2 Weeks China
Bearing of the carousel axis 509011500 3 2 Weeks China
Bushing 3215824600 3 2 Weeks China
Thrust bearing 3222036016 3 2 Weeks China
Grip axis 3222064100 6 2 Weeks China
Pin of the hydraulic cylinder 3222304202 2 2 Weeks China
Pin of the boom rotation hydraulic cylinder 3222304204 2 2 Weeks China
Pin of the holder rotation hydraulic cylinder 3222310223 1 2 Weeks China
Pin of the hydraulic cylinder 3222310226 3 2 Weeks China
Pin boom hydraulic cylinder 3222310227 2 2 Weeks China
Shaft 3222310385 2 2 Weeks China
Grip hydraulic cylinder axle 3222311719 4 2 Weeks China
Flange with swivel mechanism axle 3222314422 1 2 Weeks China
Carousel axle drive shaft 3222319752 2 2 Weeks China
Final drive 3222329874 2 2 Weeks OEM
Main pump 3222337038 1 2 Weeks China
Grip extension hydraulic cylinder pin 3222343508 3 2 Weeks China
O A6VE55 travel hydraulic motor 3222346860 2 2 Weeks China
Die lunette 3222320895 12 2 Weeks China
Dustproof sealing disc 3222322074 3 2 Weeks China
Compressor sensor B469 3222338248 1 2-4 Weeks OEM
A Sliding plate 2657376832 4 2-4 Weeks China
Wear plate of guide 2657376832 28 2-4 Weeks China
Pin of the boom base assembly 3222308395 1 2-4 Weeks China
Roller chain 3222338846 2 2-4 Weeks Original
Sprocket 3222338961 2 2-4 Weeks Original
Bearing assembly 3222343113 2 2-4 Weeks Original
Purge valve repair kit 3222340702 8 2-4 Weeks OEM
Filter dust protection valve 3222188199 8 2-4 Weeks Original
Cable KS4 3222323589 3 2-4 Weeks OEM
Cable W6 3222323637 3 2-4 Weeks Original
Cable W7 3222323637 3 2-4 Weeks Original
Cable W50 3222329237 3 2-4 Weeks Original
Cable W51 3222323671 3 2-4 Weeks Original
Cable W50i 3222331465 3 2-4 Weeks Original
Coil 9110999694 3 STOCK OEM
Denso DA/N2003 28V-95A Generator   2 STOCK  
Safety valve g/rotation motors 57588487 4 STOCK  

 COMPANY PROFILE                                                                                                                                                                                                                  

Guangzhou Future Green Machinery Co.,Ltd. founded in 2021, our office is located in Guangzhou. We are an innovative enterprise. The company always ensures the technological advancement of the equipment: higher efficiency, lower power consumption, and more environmental protection. Our main products are crushing equipment, sand making equipment, powder making machinery, feeding equipment, cement plant supporting machinery, etc. The company will continue to explore, research, develop and innovate in new fields, while constantly helping customers solve various difficulties and problems, and creating greater value for customers. Guangzhou Future Green Machinery Co.,Ltd. founded in 2021, our office is located in Guangzhou. We are an innovative enterprise. The company always ensures the technological advancement of the equipment: higher efficiency, lower power consumption, and more environmental protection. Our main products are crushing equipment, sand making equipment, powder making machinery, feeding equipment, cement plant supporting machinery, etc. The company will continue to explore, research, develop and innovate in new fields, while constantly helping customers solve various difficulties and problems, and creating greater value for customers.

 

 

 

 

 PACKAGE&DELIVERY                                                                                                                                                                                                             

 

drill jumbo is mainly suitable for the tunneling construction, underground mining and other underground projects. It can be used for drilling of blasting holes, anchor holes, and slotted holes. There is also a platform available, which can be used in the installation of explosives, anchors and other appliances. The maximum coverage area is up to 72m2.

1.Power System

Located at the middle of the frame, it is mainly composed of diesel engine, radiator, diesel box, air filter, exhaust purification device, fuel filter, oil filter, etc. In addition to providing power for driving and braking during the driving process, it can also provide power for other actions besides rock drill impact and rotation.

2.Drive System

Mainly by the front axle and rear axle, tires, gearbox, drive shaft and so on, mainly used for walking. Driving system consists of the engine power into walking vehicle power, at the same time meet the requirements of braking. Standard wet bridge.

3.Frame

Mainly divided into the front frame, frame, after the end of three parts, after the former frame and frame with vertical pin shaft between the hinged connection, can complete the vehicle of the articulated steering function; Before and after leg used in vehicle leveling jumbo drilling operations; In addition to cable reel bracket etc. Under the frame of transmission system, the frame is jumbo bearing the main structure of the various components.

4.Boom

Fixed by drill arm,triangle cylinder,square welded after the boom,tile cover type rectangular welded cylinder telescopic arm,front triangle,triangle installation before welding,rotating cylinder,welded bodyand push the beam welded turn arm bracket, etc.; Fixed seat can be connected with arm drill arm, after triangle cylinder with former oil cylinder connected by hydraulic system, to achieve the function of the parallel drill arm keep; Bracket for installing thrusters, rotating cylinder can make the propeller shaft to rotate 360 °.
 

 

CASE STUDIES FROM VARIOUS INDUSTRIES                                                                                                                                           

 

 

 

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

Mining Cone Crusher Parts Counter Shaft Bushing Suit HP200

  ✅ Advanced Metallurgy ✅ Interchangeable with Metso/Sandvik/Terex models (MP1000-CH880-C155) ✅ Zero-Run-In Performance,Pre-engineered clearance ✅ Cost Efficiency 40-60% cost savings vs. OEM ✅ Local after-sales team

View More
Crushing Equipment CH440 H4800 Cone Crusher Replacement Parts Lower Frame Bottom Shell

  ✅ 360° Full-Range Supply Capability ✅ Precision Sand Casting Superiority ✅ OEM-Exceeding Fit Performance ✅ Downtime Elimination Engineering ✅ Local after-sales team

View More
Sand Casting Steel Bottom Shell for Cone Crushers

  ✅ 360° Full-Range Supply Capability ✅ Precision Sand Casting Superiority ✅ OEM-Exceeding Fit Performance ✅ Downtime Elimination Engineering ✅ Local after-sales team

View More
PE600X900 Stone Jaw Crusher with SGS

    ✅ OEM Compatibility: Perfect fit for Sandvik CV200/Terex Canica/Metso Barmac replacements ✅ Custom Engineering: Tailored for basalt/river pebble/granite/iron ore specifics ✅ Total Cost Ownership: 3-year ROI guarantee with documented case studies ✅ Sustainable Production: Recyclable wear components with take-back program

View More
Bearing Cover Fit for C125 C130 C140 C Series Jaw Crusher Accessories

  ✅ Advanced Metallurgy ✅ Interchangeable with Metso/Sandvik/Terex models (MP1000-CH880-C155) ✅ Zero-Run-In Performance,Pre-engineered clearance ✅ Cost Efficiency 40-60% cost savings vs. OEM ✅ Local after-sales team

View More
OEM Price CS440 Cone Crusher High Manganese Steel Spare Parts Arm Shield for Hot Sale

  Cone Crusher Adjustment Ring is a crucial component that plays a pivotal role in cone crusher operation. its facilitates precise adjustments, including the gap between the mantle and concave, allowing for fine-tuned control over the particle size produced during crushing.Cone Crusher Adjustment Ring is a key component for enhancing the performance and production efficiency of cone crushers. Whether used in ore mining, construction, or mining industries, it is indispensable for ensuring the precision and reliability of the crushing process.

View More
HP300 Cone Crusher Aftermarket Parts Adjustment Ring with Good Price

  ✅ Advanced Metallurgy ✅ Interchangeable with Metso/Sandvik/Terex models (MP1000-CH880-C155) ✅ Zero-Run-In Performance,Pre-engineered clearance ✅ Cost Efficiency 40-60% cost savings vs. OEM ✅ Local after-sales team

View More
HP300 HP500 Srone Crusher Parts Manganese Steel Wear Parts Mantle and Concave Cone Crusher of Mining Parts

  ✅ Precision Engineered Compatibility ✅ Enhanced Durability ✅ Maintenance Optimization ✅ Cost Efficiency 40-60% cost savings vs. OEM ✅ Local after-sales team

View More
Our Service
Our replacement parts provide durability and reliability equivalent to original equipment manufacturer (OEM) components but at significantly lower prices, tackling the high cost of genuine parts. Benefit from faster delivery and expert remote technical support from our Finland-based team. Choose FG Machinery to minimize downtime, maximize operational efficiency, and keep your mining equipment running at peak performance.

Emergency:

+86 18820104928
Contact Us
Location Baiyun District, Guangzhou, China
Subscribe Newsletter
Subscribe Now +

Copyright © 2025 Guangzhou Future Green Machinery Co., Ltd. All Right Reserved. Network SupportedXML Privacy Policy

Guangzhou Future Green Machinery Co., Ltd.

facebook youtube

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Home

SPARE PARTS

whatsApp

contact